Advanced-Glass
startup procedures
The following is provided for your reference and information:
Filling the Pool:
Please begin filling your pool according to the time/date shown above.
Fill the pool with a continuous flow of water, even if just a small trickle. Do not stop filling part-way through, to avoid the accumulation of a "bathtub ring" that can accumulate at the water-line.
CAUTION: Initially the pool surface will be slippery, so use caution when entering and swimming in pool.
Brushing the pool is NOT required when starting-up your Advanced-Glass pool finish. When you do brush the pool for regular ongoing maintenance, use only a plastic bristled brush. Do not use a metal brush on your Advanced-Glass pool finish, as it can scratch or otherwise mar the surface.
Chemical Makeup
Below is our recommendation as to the chemical makeup of your pool water:
CHLORINE 1.0 – 1.5 parts per million
PH 7.2 – 7.4
TOTAL ALKALINITY 100-120 parts per million
CALCIUM (Hardness) 300 –350 parts per million
You may also review our Advanced-Glass Maintenance Manual for additional information.
We feel honored that you chose us to perform the work and have tried hard to have this be a positive experience for you. Should you have any questions or problems, please feel free to contact us.
We hope you enjoy your newly remodeled pool.
Sincerely,
Advanced Pool Coatings